Government Scheme Discovery
Fivefold assists customers with complete documentation, DISCOM net metering applications, and subsidy disbursal tracking under central and state renewable schemes.
PM Surya Ghar: Muft Bijli Yojana
Central government flagship rooftop solar scheme delivering up to 300 units of free power monthly and direct DBT subsidies.
- Up to 2 kW: ₹30,000 per kW (Up to ₹60,000)
- 3 kW & Above: Fixed ₹78,000 direct DBT subsidy
- Collateral-Free Loan: Low ~7% interest bank financing
- DISCOM Integration: Net metering across TPCODL/TPNODL
PM-KUSUM Yojana
Empowering farmers and rural institutions with standalone solar irrigation pumps and solarized agricultural feeders.
- 60% Subsidy: 30% Central + 30% State assistance
- Diesel Elimination: Zero recurring agricultural fuel cost
- Surplus Energy Sale: Earn revenue by feeding grid
- 0.5 to 2 MW Plants: Component A barren land solar
Odisha RE Policy 2022
State framework accelerating clean energy adoption for commercial, industrial, and institutional enterprises.
- Electricity Duty: 50 paise/unit exemption (up to 20 yrs)
- Cross-Subsidy Relief: 50% concession on wheeling/charges
- Land Exemption: 100% conversion fee reimbursement
- Single Window: Fast-track approvals via OREDA & GRIDCO
PM Surya Ghar and Odisha State Subsidy
Eligible households can receive central financial assistance under PM Surya Ghar: Muft Bijli Yojana, and Odisha has announced additional state assistance on top of it.
| System size | Central (PM Surya Ghar) | Odisha state | Combined |
|---|---|---|---|
| 1 kW | ₹30,000 | ₹25,000 | ₹55,000 |
| 2 kW | ₹60,000 | ₹50,000 | ₹1,10,000 |
| 3 kW and above | ₹78,000 | ₹60,000 | ₹1,38,000 |
Central assistance: ₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW; no additional assistance beyond 3 kW. Odisha figures are the announced state assistance: ₹25,000 for each of the first 2 kW and ₹10,000 for the third kW.
Central eligibility (PM Surya Ghar)
- Residential household owning a house with a roof, terrace or elevated area suitable for rooftop solar.
- A valid residential electricity connection from the local DISCOM; the application uses your consumer account number.
- A grid-connected system installed through a vendor registered on the national portal.
- Solar modules must meet the Domestic Content Requirement (DCR), otherwise subsidy is not released.
- The household has not already availed a subsidy for solar panels; assistance is given once per installation.
Odisha state assistance
- Residential households installing rooftop solar under PM Surya Ghar: Muft Bijli Yojana.
- The state assistance is in addition to the central subsidy for eligible installations.
- Availability, funding and procedure are set by the Government of Odisha, OREDA and your DISCOM.
Announced by the Odisha Cabinet on 3 January 2025. We could not retrieve the official notification text, so please confirm current amounts, availability and process with OREDA or your DISCOM before applying.
These subsidies are for residential households. Commercial, industrial and institutional installations are not eligible for PM Surya Ghar subsidy; they may benefit from other measures such as accelerated depreciation.
How to apply
- Register on the national portal with your state, DISCOM and consumer account number.
- Log in and apply for rooftop solar for your connection.
- After feasibility approval, choose a registered vendor and agree the system design and rates.
- The vendor installs the system; submit the plant details and apply for the net meter.
- The DISCOM installs the net meter and inspects the plant.
- Obtain the commissioning certificate from the portal.
- Submit your bank details and a cancelled cheque on the portal so the subsidy can be credited.
Official resources
Need help?
Talk to our team about your eligibility and a site assessment.
Subsidy amounts, eligibility and procedures are set by the Government of India and the Government of Odisha and may change. Approval and disbursement are decided by the authorities and are not guaranteed by Fivefold. Subsidy is a part of, not the whole of, project cost, and a technical site assessment is needed to confirm suitability. Content last verified 13 October 2026.
How Fivefold Handles Government Scheme Process
We handle the entire administrative and technical lifecycle so you don't have to deal with DISCOM paperwork.
Final eligibility, subsidy disbursal amounts, and scheme guidelines remain subject to prevailing government policies, ministry notifications, and DISCOM technical approvals.
